Longguang Jiuyu Lake Phase I: Individual Metering and Dedicated Transformer Supply & Installation Project
Release date:
2025-11-24
**I. Project Background**
The Longguang Jiuyu Lake project is a large-scale, modern residential community development initiative. The first-phase construction boasts a total floor area of approximately 200,000 square meters, featuring high-rise residential buildings, commercial amenities, and public facilities. As a key urban housing project, the reliability, safety, and standardization of its power supply system directly impact the daily lives of thousands of households—and ultimately determine the overall quality of the community.
The project site experiences hot, rainy summers and damp, cold winters, placing unique demands on the weather resistance of outdoor electrical equipment. Developer Longguang Group, guided by its "Quality of Life" philosophy, has maintained rigorous standards in the construction of its power supply system. Through an open tender process, they ultimately selected Jiangxi Yawei Electric—a partner with extensive practical experience in residential distribution systems—as their collaboration partner.
**II. Customer Requirements**
1. **Standardized Construction**: Requires that each household be equipped with a meter compliant with the latest national standards, ensuring standardized management.
2. **Power Supply Reliability**: Ensure the dedicated transformer system operates smoothly and reliably, meeting the growing electricity demands of the community.
3. **Safety Management**: Requires the equipment to have comprehensive features such as protection against electric shock, lightning strikes, and moisture.
4. **Smart Operations & Maintenance**: Enable remote meter reading and electricity data collection, enhancing management efficiency.
5. **Energy Efficiency and Environmental Protection**: Equipment must be highly energy-efficient to minimize operational losses.
6. **Schedule Assurance**: Requires timely completion of equipment supply and installation to ensure the overall project timeline.
**III. Product Plan**
Jiangxi Yawei Electric provides a complete power distribution solution for the project:
1. **Dedicated System Solutions**
- Equipped with SCB14-type high-efficiency, energy-saving dry-type transformers
- Configuring intelligent medium- and low-voltage switchgear
- Install an automatic reactive power compensation device
2. **One Household, One Meter System**
- Choose a smart, cost-controlled electricity meter
- Configuring a centralized meter reading system
- Install standardized meter boxes
3. **Power Distribution Security Assurance**
- Implement a multi-level lightning protection system
- Featuring a moisture-resistant and corrosion-proof enclosure
- Configure the electrical fire monitoring system
4. **Intelligent Management Platform**
- Deploy a remote meter-reading system
- Establish an electricity consumption information collection platform
- Enable automatic fault monitoring
**IV. Implementation Results**
After the project was completed, the power supply system operated smoothly and achieved remarkable results:
1. **Excellent Power Supply Quality**
- Voltage compliance rate reaches 99.98%
- Significant improvement in power supply reliability
- The power factor is maintained at 0.95 or higher
2. **Improved Management Efficiency**
- Enabling remote automated meter reading
- Reduce the workload of manual inspections
- Timely response to fault resolution
3. **Safe and Reliable Operation**
- Withstood numerous thunderstorm weather tests
- No electrical safety incidents occurred
- Equipment is operating in good condition.
4. **Significant Economic Benefits**
- Reduced transformer operating losses
- Maintenance costs significantly reduced
- Received positive feedback from the power supply department upon acceptance
5. **Outstanding Social Benefits**
- High electricity usage satisfaction among homeowners
- Becoming a model project for regional power distribution infrastructure construction
- Laying the foundation for future project collaborations