    Project Background
    A large-scale ground-mounted photovoltaic power plant with a total installed capacity of 100 MW needs to efficiently and reliably connect the PV DC electricity to the grid.

    Customer needs

    High-efficiency power conversion required

    Must meet grid connection standards

    Request for intelligent operations and maintenance management

    Requires adaptation to harsh outdoor environments

    Product Solution

    Providing box-type substations specifically designed for photovoltaic power generation

    Configure Intelligent Convergence and Monitoring System

    Deployment Environment Adaptability Protection Design

    Establish an Intelligent Operation and Maintenance Platform for Power Plants

    Implementation results

    The system achieves a conversion efficiency of 98.5%.

    Achieve unattended intelligent operations and maintenance

    Annual power generation exceeds the design capacity by 5%.

    Become a photovoltaic power generation demonstration project